Process
What happens after you submit an RFQ?
Schedule manufacturing capacity, allocate raw materials, and issue formal job orders to the factory floor.

Introduction
Submitting an RFQ is the beginning of the manufacturing process.
A complete quote requires more than a drawing and quantity. The manufacturing team needs to understand the material, tolerances, finishes, inspection requirements, and delivery expectations.
Drawing review
The first step is reviewing the supplied drawings and technical files.
The team checks:
Dimensions
Tolerances
Materials
Finishes
Threads
Quantity
Special requirements
Manufacturing review
The component is evaluated for manufacturability.
This can include reviewing:
Tool access
Part geometry
Fixturing
Machine requirements
Setup requirements
Inspection requirements
Conclusion
The more complete the information supplied at the beginning, the fewer questions need to be resolved before machining starts.